1. General Safety Requirements
* Do not touch the seal faces with bare hands or any contaminated objects.
* Always wear clean gloves during installation to avoid contamination.
* Keep the installation area clean, dry, and free from dust and metal particles.
* Ensure the seal model (M481), size, and materials are fully compatible with the working fluid.
⸻
2. Pre-Installation Inspection
* Check shaft or sleeve surface for scratches, corrosion, or wear.
* Ensure shaft runout and alignment are within allowable limits.
* Verify that the seal chamber and gland plate are clean and undamaged.
* Confirm all seal components are complete and undistorted.
⸻
3. Shaft and Equipment Requirements
* Shaft surface must be smooth, clean, and properly chamfered.
* Remove all burrs and sharp edges before installation.
* Ensure proper concentricity between shaft and seal chamber.
* Do not install the seal on a worn or undersized shaft surface.
⸻
4. Handling of Seal Faces
* Seal faces are precision-lapped components and must not be scratched.
* Avoid dropping or impacting any seal parts.
* Do not place seal faces directly on hard surfaces.
⸻
5. Lubrication Requirements
* Lightly lubricate O-rings with compatible lubricant before assembly.
* Use clean water, glycol, or approved grease depending on elastomer material.
* Do not use petroleum-based lubricants unless specified by manufacturer.
⸻
6. Installation Precautions
* Install stationary and rotating components in correct orientation.
* Ensure correct spring compression according to installation dimension.
* Tighten gland bolts evenly in a crisscross pattern to avoid distortion.
* Do not over-tighten set screws or gland bolts.
⸻
7. Alignment and Assembly Control
* Maintain proper shaft alignment before final tightening.
* Ensure uniform contact between seal faces after assembly.
* Check that the rotating unit moves freely without binding.
⸻
8. Pre-Start Checklist
* Rotate shaft manually before starting the pump to ensure smooth operation.
* Confirm that no dry-running condition exists.
* Fill the seal chamber with process fluid and remove all air.
* Verify that all installation tools, clips, and locking devices are removed.
⸻
9. Operation Warning
* Dry running is strictly prohibited even for a few seconds.
* Monitor initial operation for leakage, vibration, and temperature rise.
* Stop the pump immediately if abnormal noise or leakage occurs.
Jiaxing Burgmann Mechanical Seal Co., Ltd
Email: doris@mechanicalseal.com.cn
Mob: 86-15381220188
WhatsApp: 8615381220188
Website: www.industrial-mechanicalseals.com
Add: A-5 Wanyangzhongchuangcheng, Ganyao Town, Jiashan county, Jiaxing, Zhejiang, China. 314107